电源及控制设备安装 pow er and control devices for lighting 表号form number:DL/T5161.17- 3.0.2 验收范围Concealment scope 工序Process 检验项目 Check item 质量标准 Quality Standard 检验结果 Inspection result 箱或板安装install of box and panel 型式及回路数pattern and circuit in number 按设计规定comply with the designs 位置、高度location, height 箱体误差 box error 箱高box height <50cm 歪斜不明显not lean to one side dramatically 箱高box height >50cm ≤3mm 固定强度steadiness fixed 牢固 steady 箱(板)接地 box (panel) grounding 牢固,导通良好 steady, conducting well 内 部 检 查 interior inspection 回路绝缘 circuit insulating ≥0.5mΩ 负荷分配 load distribution 按设计规定comply with the designs 导线与端子连接 connection of conductor and terminal 紧固 fastened 零线、保护线连线 connection of zero line and protection line 固定在汇流排上,编号齐全 fixed on busbar, completed specifications 其 他 others 箱(板)多余孔孔封堵 seal of extra holes on the box (panel) 严密 sealed well 箱(板)内部清理 interior clean in the box (panel) 干净,无杂物 clean, not dirt 控制回路标识 identification of control circuit 齐全、清晰 completed, clear 焊接处防腐 anti-corrosion at welding spots 完好 completed 质检机构 Quality inspection organization 验收意见Comments 签名 Signature NEPC 施工班组 Construction teamSigned confirmation 符合 comply NEPC 工地技术员 Site Technician Signed confirmation 符合 comply 照明管路敷设pipe lay ing for lighting 表号form number:DL/T5161.16-1.0.2 验收范围Concealment scope 工序Process 检验项目 Check item 质量标准 Quality Standard 检验结果 Inspection result 配管检查pipe inspection 型号、规格、材质 type, specifications, materials 按设计规定 comply with the regulations 外观 appearance 钢管 steel pipe 外表面exterior 无损伤,严重锈蚀镀锌完好 no damage, galvanized wel...