1 目 录 第一章、工程施工总体概况 1、技术标准编制依据····················3 2、工程概况························4 3、本工程各项施工目标···················5 4、施工组织管理机构设置··················5 5、施工程序总体设想····················6 第二章、施工进度计划及各阶段进度保证措施 1、工期目标························7 2、工期安排························7 3、工期保证措施······················7 4、赶工技术措施······················9 第三章、劳动力、材料及施工机械投入计划及保证措施 1、施工人员组织及保证措施·················10 2、主要施工机械配置计划及保证措施·············11 3、主要原材料及周转材料计划及保证措施···········11 第四章、施工总平面布置和临时设施布置 1、施工部署总体原则····················13 2、施工临时设施······················14 3、施工组织管理机构····················15 4、施工总体顺序······················16 5、质量目标的实施·····················16 6、安全生产目标及实施···················17 第五章、关键部位施工工艺及质量控制要点 1、工程定位放线······················17 2、基础、主体工程施工···················18 3、装饰装修························24 第六章、安全文明施工管理措施 1、安全生产目标和内容···················27 2、安全生产管理措施····················27 2 3、现场管理目标······················30 4、保证措施························31 5、具体措施························32 第七章、工程质量保证措施 1、工程质量目标······················33 2、质量管理组织设置··········...