第 1 页 共 54 页7mm%Mpam/minm/min时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量时间喷量开始终止开始终止搅拌下沉1.417.51.417.51.417.51.417.51.417.50.67.513:0013:0813:0013:08搅拌提升1.620 1.620 1.620 1.620 1.620 0.78.7513:0813:1613:0813:16搅拌下沉1.417.51.417.51.417.51.417.51.417.50.67.513:1613:2413:1613:24搅拌提升1.620 1.620 1.620 1.620 1.620 0.78.7513:2413:3313:2413:33搅拌下沉1.417.51.417.51.417.51.417.51.417.50.67.513:3413:4213:3413:42搅拌提升1.620 1.620 1.620 1.620 1.620 0.78.7513:4213:5013:4213:50搅拌下沉1.417.51.417.51.417.51.417.51.417.50.67.513:5013:5813:5013:58搅拌提升1.620 1.620 1.620 1.620 1.620 0.78.7513:5814:0613:5814:06搅拌下沉1.417.51.417.51.417.51.417.51.417.514:0814:1514:0814:15搅拌提升1.620 1.620 1.620 1.620 1.62014:1514:2314:1514:23搅拌下沉1.417.51.417.51.417.51.417.51.417.514:2314:3014:2314:30搅拌提升1.620 1.620 1.620 1.620 1.62014:3014:3814:3014:38搅拌下沉1.417.51.417.51.417.51.417.51.417.514:3814:4514:3814:45搅拌提升1.620 1.620 1.620 1.620 1.62014:4514:5314:4514:53搅拌下沉1.417.51.417.51.417.51.417.51.62014:5315:0014:5315:00搅拌提升1.620 1.620 1.620 1.620 1.62015:0015:0815:0015:08搅拌下沉1.417.51.417.51.417.51.417.51.62015:0815:1515:0815:15搅拌提升1.620 1.620 1.620 1.620 1.62015:1515:2315:1515:23搅拌下沉1.417.51.417.51.417.51.417.51.417.515:2315:3015:2315:30搅拌提升1.620 1.620 1.620 1.620 1.62015:3015:3815:3015:38提升控制速度0.61设计90天水泥土试块强度1.815下沉控制速度0.72项目负责人设计桩长总承包施工单位专业承包施工单位设计桩径0.6M455M488377.5搅拌时间67施工总时间(min)31377.5水泥用量(kg)111389M42312102011-1-21123452011-1-212011-1-212011-1-21设计水泥掺量14.7序号23452011-1-21M439备注1施工工序日 期M471 水 泥 土 搅 拌 桩 施 工 记 录 表(清远工地)GD230102214项目负责人喷浆(粉)时间每 米 下 沉 或 提 升 时 间 (min/m) /每 米 下 沉 或 提 供 的 喷 浆 量 (L/m) 或 喷 粉 量(kg/m)单位(子单位)工程名称:桩号12#机30375341...