监 理 工 作 制 度 济源市规划建筑设计院有限公司 二0 一五年五月一日 2 目 录 一、 图纸会审制度····································1 二、 施工组织设计/方案审查制度·······················1 三、 开工报告审核制度································3 四、 材料、构配件检查、复验制度······················3 五、 设计变更制度····································4 六、 隐蔽工程检查验收制度····························5 七、旁站监理制度·····································5 八、检验批、分项、分部(子分部)工程质量验收制度·····6 九、单位工程竣工预验收制度···························8 十、工程质量事故处理制度·····························8 十一、监理会议制度···································9 十二、监理报告制度···································9 十三、监理日记制度···································1 0 十四、见证取送样制度·································1 1 十五、监理资料管理及归档制度·························1 2 3 监理工作制度 一 、图纸会审制度 由 业 主 组 织 设 计 、施工、监理等单位人员参加,进行图纸会审,并做好会审记录,经设 计 人对记录审查签认后作为施工依据
二、施工组织设计/方案审查制度