施工组织设计目录一、工程概况························41、工程名称及规模·····················42、工程范围及内容·····················43、建筑与结构·······················54、电气工程························55、给排水工程·······················66、采暖工程························77、材料做法························78、工期要求························79、质量要求························810、平安及环保要求·····················811、自然条件························812、施工条件························813、相关单位························8二、施工总体组织及规划···················91、总体主导思路······················92、工程管理组织······················93、施工队伍部署及任务划分·················104 施工准备·························105、各部门职责·······················146 施工总平面布置······················167、总体施工组织方案····················188、施工工期目标规划····················199、工程质量目标规划····················1910、平安、文明施工与环保目标规划·············19三、施工进度方案安排···················191、总工期方案安排·····················192、施工进度方案横道图···················20四、劳动力方案安排····················20五、主要施工机械设备配备·················20六、主要材料(设备)供应进度方案··············21七、主要分部、分项工程施工方案··············227.1、施工测量··············...