目 录一、编制依据............................................................1二、工程概况及设备概况..................................................1 工程概况..............................................................1 设备概况..............................................................2三、轨道梁设计..........................................................2 地基验算..............................................................2 地基形式............................................................2 地基承载力验算......................................................3 轨道梁配筋设计........................................................4四、施工方法............................................................8 施工工艺流程..........................................................8 轨道梁施工施工........................................................8 人员、机械投入计划....................................................9五、质量保证措施.......................................................10 模板质量保证措施.....................................................10 钢筋质量保证措施.....................................................10 混凝土质量保证措施...................................................10六、安全文明施工保证措施...............................................10一、编制依据(1)《建筑地基基础设计法律规范》(GB50007-2024);(2)《混凝土结构设计法律规范》(GB50010-2024);(3)《混凝土结构工程施工质量验收法律规范》(GB50204-2024);(4)站东广场站、文化宫站围护结构施工图;(5)站东广场站、文化宫站主体结构施工图;(6)站东广场站、文化宫站平面布置图;(7)门式起重机厂家技术资料。二、工程概况及设备概况 工程概况徐州地铁 1 号线土建 03 标共设置 2 台 45/16t 门式起重机主要用于盾构机的出碴土吊装工作,1 台 16t 门式起重机主要用于管片吊装工作。先在站东广场站安装 2 台 45/16t 门式起重机和 1 台 16t 门式起重机,徐州火车站站~站东广场站区间盾构施工完成后将门式起重机拆除转场至文化宫站安装,进行文化宫站~徐州火车站站区间、彭城广...