塔吊基础设计与施工专项方案编制指南(桩基础)工程名称:文件编号:CSCEC5-FAZN-10(项目自拟编号)发布日期:执行日期:插入项目效果图[工程名称]塔吊基础设计与施工专项方案(桩基础)目录一、编制说明·············································································11.1编制依据·······································································11.2编制人员·······································································11.3发放范围·······································································1二、工程概况·············································································22.1工程总体概况·································································22.2工程地质及场地周边情况··················································22.3施工平面布置·································································32.4施工要求和技术保证条件··················································4三、施工计划·············································································53.1施工进度计划·································································53.2材料与设备计划······························································5四、施工管理及作业人员配备和分工···············································64.1施工管理人员·································································64.2专职安全管理人员···························································64.3特种作业人员·································································64.4其他作业人员·································································6五、施工工艺技术·······································································75.1技术参数·······································································75.2塔吊基础设计·································································85.3施工方法······································································10六、验收要求···············...