目 录一、编制依据...........................................................................2二、工程概况...........................................................................2三、作业条件...........................................................................3四、施工准备...........................................................................3五、施工方法、验收标准和各项保证措施...........................3六、安全措施...........................................................................5七、塔机安装过程安全事故防范措施和应急救援预案.......77.1 安全事故防范措施..........................................................77.2 应急救援组织机构..........................................................77.3、应急救援预案.................................................................8八、塔吊拆除...........................................................................8九、计算书.............................................................................10附图:塔施-1:塔吊桩基平面布置图及配筋图塔施-2:塔吊桩基大样及说明塔施-3:塔吊桩基础、承台剖面图塔施-4:塔吊桩基础承台配筋图一、编制依据《建筑地基基础设计法律规范》(GB50007-2024);《建筑结构荷载法律规范》(GB500092001);《混凝土结构设计法律规范》(GB50010-2024;)《 QTZ5013D 塔 式 起 重 机 使 用 说 明 书 》 ( 制 造 许 可 证 : TS2410639-2024);《本工程岩土工程详细勘察报告》(06-0830);《本工程施工图纸》;《本工程施工组织设计》。二、工程概况 根据施工组织设计的部署,本工程需在 B 轴~C 轴交 1/20 轴到 21 轴间安装一台 QTZ5013D 型塔吊,因受场地限制,无法满足独立基础的施工要求;现根据现场实际情况,采纳桩基础方案。塔吊桩基采纳和工程桩一样 的 人 工 挖 孔 扩 底 灌 注 桩 , 桩 径 为 800mm , 桩 长 为 6m 。 承 台 为60000mm×6000mm×1000mm。QTZ5013D 型塔吊对砼基础荷载及尺寸要求如下:对地面压应力(pa)b(m)h(m)砼基础重量Fq(KN)Fv(KN)Fh(KN)M(KN.m)2.0×1055.01.480540830.414861.7×1055.51.280540830.414861.0×1056.01.082840830.41486现根据现场的实际情况和设...