使用 LB70-2D 型流速仪在 U 型渠道断面上布设一条测速垂线(中垂线)实测率定流速修正系数的探讨使用 LB70-2D 型流速仪在 U 型渠道断面上布设一条测速垂线(中垂线)实测率定流速修正系数的探讨 摘要:本文中作者针对灌区测流量水过程中为简化 U 型渠道的计算,在测流过程中布设一条测速垂线(中垂线)实测流量涉及到的流速系数的取值问题,根据《宁夏引黄灌区测流量水法律规范》及相关规程,在惠农渠灌区内选用了一条干渠和两条支(斗)渠对U 型渠道流速修正系数进行了实测率定并与参照值(梯形或矩形的规定经验取值岸边流速系数)相对比,做对比分析,提出了一些建议。 关键词:LB70-2D 型流速仪;U 型渠道;计算;流速系数 Abstract: in this paper the author for irrigation test in the process of water flow to simplify the calculation of U channel, in the current process layout a speed vertical (perpendicular bisector) measured flow involves velocity factor values of problems, according to the Yellow River in ningxia irrigation water flow measurement standard "and related regulations, in benefiting the canal irrigation is a main canal and two branch (measures) channel to U channel velocity correction coefficient for the rate constant and with reference value (ladder or the provisions of the rectangular experience value flow coefficient) phase contrast, comparative analysis, and put forward some Suggestions. Keywords: LB70-2 D type current meter; U channel; Calculation; Velocity coefficient 中图分类号:TV 文献标识码:A 文章编号:2095-2104(2025) 一、问题的提出 惠农渠灌区使用流速仪测流的干、支(斗)渠为 369 条, U 型渠道就占到了 40%,可见,很有必要对 U 型渠道测流量水技术从不同的角度做讨论和探讨,针对目前在测流量水过程中为简化计算布设一条测速垂线测流所涉及的流速修正系数的取值问题,本着提高灌区测流量水精度和法律规范测流量水工作的目的,我根据《宁夏引黄灌区测流量水法律规范》及相关规程在惠农渠灌区内选择了一条干渠和两条支(斗)渠,从 2025 年 6 月 15 日开始,前后用了 5 个多月的...