****国际新城一期(A区)A标段工程施工组织设计二OO四年十一月二十一日目录第一章工程概况·················1-1第二章施工组织措施···············1-7第一节施工组织机构··············1-3第二节工程项目管理目标············3-4第三节施工总体布置··············5-6第四节新技术、新工艺、新材料的推广应用····6-7第三章施工总平面布置···············7-10第一节施工平面布置概述············7-8第二节施工用水、用电·············9-9第三节现场施工排水··············9-9第四节现场垂直、水平运输机械的布置······9-10第五节施工道路及临时设施···········10-10第四章施工进度计划················10-11第一节施工进度计划编制说明·········10-10第二节施工形象进度·············10-10第三节施工进度网络计划···········10-11第五章施工准备工作···············11-14第四节施工技术准备工作············11-11第五节施工现场准备工作············11-11第六节施工机械设备准备计划··········11-12第七节施工材料、劳动力准备计划········12-14第六章主要工程施工方案·············14-42第一节施工测量方案·············14-17第二节主体结构施工方案···········17-24第三节门窗工程施工方案···········24-27第四节装饰工程施工方案···········27-31第五节屋面工程施工方案···········31-35第六节楼地面工程施工方案··········35-