目录1第一章编制依据及原则·································22第二章工程概况·········································43第三章施工部署·········································54第四章施工准备········································215第五章施工方案及主要技术措施··························256第六章工程质量及创优保证措施··························627第七章施工进度计划安排及保证工期措施··················638第八章工程质量保证措施································649第九章安全、消防、保卫管理······························8410第十章环境保护与文明施工管理·························94第一章、编制依据及原则1
1编制依据1
1招标文件及答疑文件招标单位文件名称项目编号高唐县双海湖风景区开发建设有限公司高唐县双海湖风景区开发建设有限公司南五里铺安置小区幼儿园工程(施工)招标文件GG2016-GG01C-148、0677-Z160634-883/S1
2工程设计图纸设计单位山东筑铭施工设计有限公司设计图纸名称高唐县南五里铺安置小区幼儿园建筑施工图纸高唐县南五里铺安置小区幼儿园结构施工图纸高唐县南五里铺安置小区幼儿园电气施工图纸高唐县南五里铺安置小区幼儿园给排水施工图纸高唐县南五里铺安置小区幼儿园暖通施工图纸1
3国家颁布的规范、规程及行业标准序号文件名称文件编号1民用建筑设计通则GB50352-20052全国民用建筑工程设计技术措施2009年版3托儿