安徽池州石台(珂田)35kV变电站工程施工安全管理及风险控制方案池州市石台利源有限公司16年8月20日批准:年月日技术审核:年月日安全审核:年月日编写:年月日目录1概述························11.1编制目的···································································11.2编制依据···································································11.3工程概况···································································32安全目标························32.1安全管理目标·····························································42.2环境目标···································································42.3文明施工目标······························································43安全管理机构及职责···················43.1管理机构····································································53.2安全职责······························································54施工安全管理措施····················84.1作业人员基本条件·······················································84.2安全管理制度和台帐····················································84.3专项施工方案···························································104.4施工机械管理···························································114.5安全费用管理···························································124.6作业人员行为管理·····················································124.7应急管理措施···························································125施工安全风险管理···················135.1施工安全风险管理措施···············································135.2重大施工安全风险控制措施·········································146安全文明施工管理措施·················186.1施工准备阶段···························································186.2土建施工阶段···························································216.3电气安装阶段···························································236.4试验调试阶段··························································...