目录第一章工程概况.....................................................31.1土建工程概况................................................31.2安装装修工程概况............................................31.3现场概况....................................................3第二章编制说明及依据...............................................42.1编制说明....................................................42.2编制依据....................................................4第三章施工总体部署.................................................53.1施工总体指导思想............................................53.2管理目标....................................................63.3任务划分....................................................73.4资源配置....................................................73.5施工总体安排...............................................123.6施工进度计划安排...........................................173.7施工平面布置...............................................173.8施工临电和临水.............................................18第四章施工重点、难点及保证措施....................................194.1环控专业施工重点、难点及保证措施...........................194.2给排水及水消防专业施工重点、难点及保证措施.................204.3动力照明专业施工重点、难点及保证措施.......................214.4装修专业施工重点、难点及保证措施...........................21第五章接口管理....................................................225.1接口协调的主要内容.........................................235.2接口协调遵循的原则.........................................335.3接口协调配合的主要措施.....................................34第六章施工技术方法................................................356.1施工测量...................................................356.2环控工程施工方法...........................................366.3动力照明工程施工方法.......................................446.4给排水及水消防工程施工方法.................................556.5综合管线布置...............................................626.6装修工程施工技术方案.......................................626.7轨行区施工管理办法.........................................776.8设备吊装运输方案...........................................796.9调试方案...................................................80第七章施工管理制度与措施..........................................927.1质量管理与措施.............................................927.2安全管理与措施.............................................947.3文明施工管理与措施.........................................977.4工期管理..................................................1017.5地盘商管理................................................1027.6甲供及乙购设备材料管理....................................1037.7成品及半成品保护措施......................................104第一章工程概况1.1土建工程概况1.2安装装修工程概况1.3现场概况第二章编制说明及依据2.1编制说明2.2编制依据第三章施工总体部署3.1施工总体指导思想为“安全、优质、按期、有序”完成本站的装修、安装工程,确保××工程五号线总体要求,以精品工程回报××工程公司,制定施工指导思想为:顾全大局、精心组织、强化管理、技术先行、严控质量、确保工期、注重环保、安全文明。顾全大局:积极组织、协调建筑、通信、信号、AFC、PIS、BAS、FAS、综合安防、电扶梯、导向标识等相关专业之间的接口配合工作,以及成品、半成品保护。将各专业之间的影响消除到最小。确保全站的整体顺利交验。精心...