文件编号:SDSSJ-CH-20150201肯尼亚焦摩肯亚塔机场跑道升级项目项目编码:201302540404034前期策划指导书(初稿)公司工程科技部汇编二〇一五年五月1目录总说明_________________________________________________1一、项目概况_____________________________________________21.1基本情况_____________________________________________21.2工程内容_____________________________________________31.3合同条件_____________________________________________31.4主要工程量表_________________________________________41.5施工条件_____________________________________________51.6工程特点与施工风险评估_______________________________61.7项目进展及当前存在困难______________________________111.8项目组织____________________________________________13二、合同风险分析与应对措施______________________________142.1资金风险____________________________________________142.2税收风险____________________________________________142.3工期风险____________________________________________152.4施工风险____________________________________________152.5设计风险____________________________________________162.6分包商管理的风险____________________________________16三、施工方案及注意事项提示______________________________173.1施工方案____________________________________________173.2进度控制____________________________________________183.3跑道施工____________________________________________18四、进度管理策划________________________________________204.1公司管理要求________________________________________204.2进度计划策划________________________________________20五、经济管理策划(暂未汇入)____________________________22六、招标采购与分包管理策划______________________________236.1招标采购策划________________________________________236.2分包管理策划________________________________________242七、财务管理策划________________________________________277.1防范汇率风险________________________________________277.2严控“两金”风险____________________________________287.3前期税收筹划________________________________________297.4规范执行建造合同____________________________________31八、资金风控分析与策划__________________________________338.1项目政治风险应对措施________________________________338.2现金流量分析________________________________________338.3保函及信用证风险____________________________________35九、设备物资材料采购供应策划____________________________369.1设备物资配置计划____________________________________369.2设备物资材料采购实施阶段____________________________36十、质量管理策划________________________________________3810.1永久材料质量控制___________________________________3810.2施工前质量控制_____________________________________3810.3现场施工阶段的质量管理_____________________________38十一、HSE风险及应对措施________________________________4011.1HSE主要风险_______________________________________4011.2HSE风险应对措施:_________________________________40十二、法律风险防范策划__________________________________4112.1通用方案___________________________________________4112.2专项方案___________________________________________45十三、工程保险策划______________________________________46十四、科技创新策划______________________________________463第1页共54页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共54页总说明策划启动部署:5月8日,公司首席徐建亭组织工程科技部、经济管理部、设备物资部、安全环保部、财务产权部、资金管理部、人力资源部...