目录第一章编制说明········································1第一节编制依据····································1第二节编制原则····································1第三节编制范围····································2第二章工程概况·········································3第一节工程概况··································3第二节工程特1112334566991011111111点····································4第三章施工部署········································5第一节项目部组织机构人员配备····················5第二节施工组织机构主要职责范围··················6第三节施工现场总平面布置·························9第四节机械设备配备·······························9第五节材料构配件供应····························第四章质量目标及工期承诺····························第一节质量目标··································第二节创优计划··································第三节工期承诺··································第四节安全承诺·····································第五节环保承诺··································第六节文明施工承诺······························第五章施工准备······································第一节施工现场准备······························第二节技术准备··································第三节场地清理··································第四节临时工程设施建设··························第六章施工方案步骤和措施····························第一节施工方案··································第二节施工步骤·······························111212131313151517171724262626283338···第三节施工措施··································第七章工期质量保证措施·······························第一节建立质量控制机构··························第二节强化质量意识、健全规章制度···············第三节制定保障措施······························第四节单项工程的质量保证措施···················第五节雨季施工措施·······························第八章施工节约技术措施······························第九章技术保证措施··································第十章工期保证措施·····························404143434343494949495050·····第一节施工工期··································第二节施工进度计划···························...