成温江区金马湖大桥东岸辅道〔南线〕工程监理规划总监理工程师:技术负责人:四川三信建立咨询编制日:年月日目录一、工程工程概况·······················2二、监理工作范围·······················2三、监理工作内容·······················31、测量放线监理工作要点·················32、路基监理工作要点···················53、原地面清理及填前压实监理工作要点···········74、填筑路基监理工作要点·················85、软基处理的监理要点··················96、软基处理后沉降监测监理工作要点············107、路基填土压实监理工作要点···············108、路基修整监理工作要点·················119、基层监理工作要点···················1210、水泥稳定土监理工作要点···············1411、路面监理工作要点··················1712、沥青砼面层监理工作要点···············1813、雨、污水工程监理工作要点··············2114、预制构件质量监理工作要点··············2415、检查井监理工作要点·················24四、监理工作······················26五、监理工作根据······················35六、监理机构的组成员装备················36七、工程监理部及主要监理人员职责··············36八、监理工作程序······················41一、工程概况工程名称:成温江区金马湖大桥东岸辅道〔南线〕工程工程业主:成金马瑞城土地整理设计:四川大学工程设计研究院施工:南充政工程温江工程部监理:四川三信建立咨询本工程位于成温江区金马镇西侧起于新华大道止于河堤路全长596.099米。本工程属于新建工程全线共设1座涵洞。本次设计道路为城次干道Ⅱ级设计车速20Km/h路面设计年限15年道路交通等级为中等交通计算荷载城-B,路面计算轴载BZZ-100KN,桥涵设计荷载为城-B〔抗震烈度按7º设防〕。道路纵坡9最小纵坡0.3竖曲线最小长度20米。道路红线设计宽度为30米路幅构成为:30米=3.0米〔人行道〕+7.0米〔机动车道〕+20.0米〔绿化带〕。车行道:4cmAC-13(上面层)+5cmAC-20(下面层)+30cm含5二、监理工作范围根据本工程监理效劳合同及业主的受权按照?建立工程监理?〔GB50319—2000〕规定对该建立工程工程施工质量进展监控并配合业主对工程进度及的监控工作。对工程质量的控制主要通过有效的质量控制工作和详细的质量控制措施在满足和进度要求的前提下实现预定的质量目的。质量控制的重点在于通过原材料机构配件质量控制、施工条件〔人员、机械设备、施工场地、施工技术准备等〕施工及施工工艺的审查、施工序的检查、控制等系统的监控工作到达有效控制工程质量。三、监理工作内容按照监理效劳合同要求对合同工程中的全部建筑物施工活动进展全过程质量监视。1、测量放线监理工作要点:测量监理工作流程:不同意同意核对中线控制桩、水准点承包人道路测量放线承包人填写测量放样报验单承包人监理旁站承包人根据要求自检合格并报测量放样资料填写测量开工报审表承包人监理工程师审批附:●施工方案●质量●工程坐标资料●上岗人员证书不合格合格、签证①、监理人员在熟悉设计和图纸的根底上会同承包人、设计或勘测部门在现场交接中线控制桩和水准点并和检查承包人对所有测量控制桩和水准点进展有效的保护直到工程开工验收完毕。②、监理工程师对业主提供的图纸上获得的资料或在设计现场交桩获得的原始定线资料进展复核和校核确保原始定线方位、水准点高程的数据准确无误。假设发现有连续两个以上原始基准点或基准高程丧失、损坏时应通过业主由设计勘测补定。③、监理工程师应审核和检查承包人提交的施工放线报验单及测量资料。对进展检查验收合格的及时给...