(项目名称)塔类设备安装工程监理实施细则范本WHYT/XZ-单位名称-装置单元号-细则流水号***监理有限公司(项目部名称)序号版次编制审批时间目录1总则....................................................................22适用范围................................................................23编制依据................................................................24工程概况................................................................24.1工程概况...........................................................24.2主要实物工程量.....................................................45.施工准备阶段质量控制....................................................55.1强制性条件.........................................................55.2技术准备...........................................................55.3施工现场...........................................................65.4规范性引用文件.....................................................66施工程序和过程质量控制..................................................66.1开箱检验...........................................................76.2基础处理...........................................................76.3施工组织设计(方案)审查程序.......................................86.4整体设备筒体吊装...................................................86.5内件安装..........................................................107试压...................................................................138质量通病及预防措施.....................................................138.1塔盘板、降液板等损坏变形、腐蚀....................................138.2塔盘紧固件或工具遗留在塔内........................................148.3安装的塔盘受损或被泥土、油污弄脏..................................149各等级质量控制点/旁站/平检..............................................1410HSE管理..............................................................1510.1施工现场的安全要求...............................................1510.2高处作业.........................................................1810.3脚手架安全管理...................................................1910.4施工机具安全管理.................................................2110.5施工用电安全管理.................................................2210.6冬、雨季施工安全施工.............................................2310.7现场防火安全要求.................................................2311交工技术文件...........................................................2311.1交工文件规定.....................................................2311.2交工文件种类.....................................................231总则为了规范建设工程项目质量控制,满足规定要求,《塔类设备安装工程监理实施细则》,是北京华夏石化工程监理有限公司烟台万华项目部为本工程编制的专项指导性文件,用于控制外部组织施工及验收管理,特制定本细则规定。2适用范围本监理实施细则适用于烟台万华搬迁一体化项目气化装置塔类设备安装工程施工的质量控制。3编制依据3.1监理合同;3.2与本工程有关的勘察报告、设计图纸及其它设计文件;3.3国家和建设部制定的有关工程建设政策、法律、法规;3.4国家和行业标准规范;3.5已批准的本工程《监理规划》;3.6已批准的本工程《施工组织设计/施工方案》。4工程概况4.1工程概况烟台万华聚氨酯股份有限公司老厂搬迁异氰酸酯一体化项目(简称:烟台万华搬迁一体化项目)主要包括60万吨MDI生产装置,配套建设氯碱、电、煤造气(气化)、硝基苯、苯胺及公用工程等装置;项目位于山东省烟台市经济技术开...