新建西安至成都铁路西安至江油段(陕西境内)站前工程(XCZQ-5标段)环保与水保方案目录1.编制目的、依据、原则......................................................21.1编制目的............................................................21.2编制依据............................................................21.3编制原则............................................................22.工程概况..................................................................32.1工程范围............................................................32.2线路地理位置及气候条件..............................................33.保证体系..................................................................33.1成立环保、水保领导小组..............................................43.2环保组织机构主要职责................................................53.3实行环保工作责任制..................................................63.4加强环保、水保工作宣传,提高环水保意识..............................73.5建立完善的环境监测体系,制定环境监测计划............................74.环、水保护内容及措施......................................................74.1大临设施的环、水保内容和防范措施....................................74.2路基工程环、水保内容和措施..........................................94.3桥涵工程环、水保内容措施...........................................104.4隧道工程环、水保内容和措施.........................................115.朱鹮保护区及周边环、水保措施.............................................125.1朱鹮保护区概况.....................................................125.2朱鹮保护区及其周边环、水保措施.....................................136.相关实施项目的保证措施...................................................146.1管理措施...........................................................146.2管理机构及主要职责.................................................156.3施工环保、水土保持管理制度.........................................187.突发环境事故应急预案.....................................................187.1适应范围...........................................................187.2组织机构...........................................................187.3领导小组职责.......................................................187.4应急响应...........................................................198.奖励与处罚...............................................................208.1奖罚管理...........................................................208.2奖励与处罚.........................................................20附图1环境保护保证体系框图.................................................21附图2水土保持工作体系框图.................................................22施工环保、水土保持方案1.编制目的、依据、原则1.1编制目的做到依法施工,文明施工,杜绝违法施工、野蛮施工事件发生;环保、水保工程与主体工程“三同时”(即同时设计、同时施工,同时投入使用),不留尾巴,不留后患。做到环境污染控制有效;土地资源节约利用;工程绿化完善美观;节能、节材和水保措施落实到位;努力建成一流的资源节约型、环境友好型铁路。在施工过程中各项条件都符合国家、部及地方政府有关环保的要求;排放标准达到国家、铁道部及当地政府有关规定、标准的要求、符合国家环水保部门有关规定。中国水利水电第十四工程局有限公司1新建西安至成都铁路西安至江油段(陕西境内)站前工程(XCZQ-5标段)环保与水保方案1.2编制依据(1)《环境管理体系的要求及使用指南》(GB/T24001-2004);(2)《环境保护法》;...