目 录一、编制依据..............................................2二、编制原则..............................................2三、编制范围..............................................3四、工程概况及主要工程量..................................31.主要技术指标.........................................32.主要工程量...........................................4五、建设工程项目所在地区特征..............................41.水文地质特征.........................................42.气象特征.............................................53.不良地质及特殊地质...................................5六、施工总体部署及资源配置计划............................51.施工组织管理机构及施工工班队伍的分部.................52.大临工程的分布及总体设计.............................73.施工进度计划.........................................84.资源配置计划.........................................9七、施工方案.............................................111.总体施工方案........................................112.涵洞施工工艺流程....................................113.框架涵施工方法......................................124.涵洞沉降变形观测....................................27八、管理措施.............................................311.安全保证措施........................................312.质量保证措施........................................333.工期保证措施........................................344.雨季施工措施........................................375.环境保护文明施工措施................................37涵洞单位工程(区间涵洞)施工组织设计一、编制依据1.新建郑州至万州铁路河南段 ZWZQ-7 标施工设计文件、设计技术交底及有关参考资料。2. 国家现行设计、施工规范、验标及技术安全规程等有关文件。3.现场施工调查资料及我单位的设备状况、技术能力和以往类似工程的施工经验。4.《高速铁路桥涵工程施工质量验收标准》(TB10752-2010)5.《铁路混凝土工程施工技术指南》(铁建设 2010-241 号)、《铁路混凝土工程施工质量验收标准》(TB10424-2010)。6.郑万铁路客运专线河南有限公司下发的《指导性施工组织设计》、《标准化建设方案》及有关文件。7...