u论文编号: 本科生毕业论文(设计)学生姓名:专 业:资源勘查工程学 号:指导教师: 论文题目英文翻译摘 要在对铁矿区以往地质工作程度的调查,以及对区域地质特征和矿区地质特征调查的基础上,通过“钻探矿工程 ”、“采样与测试 ”、“原始编录及综合资料整理 ”等方法和手段,在确保经费、安全保障等前提下,保质保量完成矿区勘查设计项目。关键词:铁矿矿区; 地质勘查; 钻探矿工程; 采样与测试; 编录经费预算; 保障措施AbstractIn the past, the survey of the geological work extent of Iron Ore District,And on the basis of regional geology and survey of geological characteristics , By "drilling and mining engineering," "Sampling and Testing," "original catalog and comprehensive data compilation" and other ways,on the premise that ensure funding,security to complete the design of mine exploration projects.Keywords: Iron Ore Mine; Geological Survey; Drilling and miningengineering; Sampling and Testing; CatalogBudget; Safeguards目 录第一章 绪言............................................................................................1第一节 基本情况..............................................................................1第二节 勘查目的和任务..................................................................1第三节 勘查工作区位置、交通及社会经济状况..........................2第二章 以往地质工作程度....................................................................4第三章 勘查区地质情况........................................................................7第一节 区域地质特征......................................................................7第二节 矿区地质特征....................................................................14第四章 工作部署及工作安排..............................................................26第一节 工作部署............................................................................26第二节 工作安排.............................................................................