第一章 综合说明·······················121.1 编制说明·······················121.2 编制依据·······················121.3 编制原则·······················131.4 工程概况·······················131.5 工程地质、水文、气象条件···············171.6 施工场地状况·····················191.7 工程特点与施工难点··················191.7.1 工程特点····················191.7.2 施工难点····················201.7.3 主要应对措施··················21第二章 施工总体布署·····················222.1 施工总平面布置····················222.1.1 施工总平面布置原则···············222.1.2 施工总平面布置图(见图 2-1-1,2-1-2)·······222.1.3 主要工程施工平面布置(见图 2-1-1,2-1-2)·····222.1.4 临时生产及生活用房···············242.1.5 现场围护····················252.1.6 施工道路及场地硬化···············252.1.7 临时通讯····················252.1.8 临时施工用水··················252.1.9 施工用电····················262.1.10 施工弃土···················272.1.11 现场排水、排污处理··············282.2 施工组织机构·····················282.2.1 组织机构设置··················282.2.2 施工组织管理机构的运作·············292.3 施工区段及任务划分··················302.4 各分项工程施工顺序··················312.5 施工准备·······················322.6 施工测量·······················332.6.1 平面控制····················332.6.2 高程控制····················342.6.3 顶管姿态测量··············...