第一章 综合说明·······················121
1 编制说明·······················121
2 编制依据·······················121
3 编制原则·······················131
4 工程概况·······················131
5 工程地质、水文、气象条件···············171
6 施工场地状况·····················191
7 工程特点与施工难点··················191
1 工程特点····················191
2 施工难点····················201
3 主要应对措施··················21第二章 施工总体布署·····················222
1 施工总平面布置····················222
1 施工总平面布置原则···············222
2 施工总平面布置图(见图 2-1-1,2-1-2)·······222
3 主要工程施工平面布置(见图 2-1-1,2-1-2)·····222
4 临时生产及生活用房···············242
5 现场围护····················252
6 施工道路及场地硬化···············252
7 临时通讯····················252
8 临时施工用水··················252
9 施工用电····················262
10 施工弃土···················272
11 现场排水、排污处理··············282
2 施工组织