下载后可任意编辑目录1编制说明...............................................21.1 编制依据及原则.....................................21.1.1 工程招标文件及工程承包合同....................22施工部署...............................................22.1 施工准备...........................................32.2 敷设电缆应具备的条件...............................32.3 人员机具需用计划...................................333.电缆敷设施工技术措施.................................43.1 现场对机具、材料的检查.............................43.2 现场对电缆敷设机具的安装固定.......................43.3 现场对电缆盘的运输.................................53.4 现场对电缆敷设起点的确定...........................54施工程序和施工方法.....................................64.1、施工程序..........................................64.2、施工方法..........................................64.3、电缆敷设的具体路径................................64.4 电缆敷设工具的摆放.................................74.5 电缆敷设方法.......................................75安全技术措施...........................................91 编制说明1下载后可任意编辑本工程为连云港港徐圩港区液体散货泊位一期工程安装工程,为了保质保量按时完成电气电缆敷设的施工任务,便于准确地指导电缆敷设的施工开展,争创优质工程,特编制此方案来指导现场施工。本施工方案是根据现有图纸设计要求法律规范,结合我单位在同类装置的施工经验编制而成的。1.1 编制依据及原则1.1.1 工程招标文件及工程承包合同1.1.2 设计院所给图纸1.1.3 国家相关法律规范 《电气装置安装工程 1KV 及以下配线工程施工及验收法律规范》(GB50575-2024)《电气装置安装工程电缆线路施工验收法律规范》GB50168-2024《建筑电气工程施工质量验收法律规范》 GB50303-2024《建筑安全生产监督管理规定》《建设工程施工现管理规定》2 施工部署2.1 施工准备2.1.1技术准备1)根据现场情况编制安全技术交底2)对施工所用材料等设备进行检查报验3)施工组织人员已经对电缆敷设表册熟悉2.1.2现场准备1)现场桥架、穿线管已经施工完成,且经过检查报验2下载后可任意编辑2)组织施工人员熟悉现场施工环境,选择合理的敷设线路3)对施工人...