Interview conducted for C/E&2/E candidate 1: What is the plant to ready for manoeuving and departure port
*start the second generator and after all checks, take it on load *The third generator should be kept on standby condition *Essential steps to be noted: Turning engine indicator cocks parameters abnormal noise *Check system FO service and settling tanks diesel oil service tank air system LO system T/C CW system checking the fuel regulating gear & starting system * slow turning the engine *this must be carried out to prevent damage caused by fluid in one of the cylinders and to check the reversing mechanism *Before beginning the slow turning obtain permission from the bridge 2 what items to be analysis on lube oil
*Specific gravity viscosity flash point TAN(total acid number)SAN(stron