下载后可任意编辑玻璃幕墙施工工艺流程12024 年 4 月 19 日下载后可任意编辑目录一、安装施工前准备..............................................................................2二、幕墙立柱的测量放线......................................................................2三、连接件的安装...................................................................................4四、幕墙立柱安装...................................................................................5五、幕墙校正与验收..............................................................................5六、横梁安装...........................................................................................6七、立柱加固及二次防腐处理..............................................................7八、防火层安装.......................................................................................8九、防火棉及保温棉安装......................................................................8十、玻璃板块安装...................................................................................9十一、幕墙注耐侯密封胶.....................................................................10十二、幕墙清洁......................................................................................1122024 年 4 月 19 日下载后可任意编辑一、安装施工前准备施工前准备属于工程前期工作,准备工作的好坏、是否充分对工程施工有很大的影响。(一)了解工程概况(二)技术资料准备(三)施工用机具准备(四)材料准备(五)临时设施二、幕墙立柱的测量放线立柱定位放线依据幕墙施工图纸确定,误差处理方案确定后进行。立柱定位放线是幕墙安装关键性的一步,其误差大小直接影响后期各工序的安装质量,立柱定位放线要求考虑的问题很全面,包32024 年 4 月 19 日下载后可任意编辑括各转角、节点处的尺寸处理,要考虑玻璃的规格、封口的方向,立柱的安装方向等问题。(一)放线用主要工具:铁线电焊条及固定支点用的角铁、废钢筋、模板、经纬仪、水准仪等。(二)工艺流程:水平分割→复查水平分割的误差→吊垂直线→检查垂直度→固定垂直线→检查所有放线的准确性→重点清查转角,变面位置的放线情...