目录第一章总体概述.................................................................................31.1、工程概况......................................................................31.2、施工组织总体设想.........................................................41.3、施工组织方案针对性.....................................................51.4、施工段的划分.................................................................6第二章项目管理人员配备及劳动力、机械设备和材料投入计划..82.1、项目管理人员配备.........................................................82.2、项目管理人员岗位职责.................................................82.3、劳动力投入计划............................................................112.4、材料投入计划...............................................................132.5、设备投入计划...............................................................13第三章施工总平面布置及临时工程................................................163.1、施工总平面布置...........................................................163.2、临时工程.......................................................................16第四章顶管、开挖管、钢管施工....................................................204.1、测量放线........................................................................204.2、顶管施工........................................................................224.2.1、工作坑、接受坑制作.............................................224.2.2、沉井制作.................................................................264.2.3、顶管顶进.................................................................324.2.4、顶管工程质量防治.................................................404.3、大开挖管施工...............................................................424.4、钢管施工........................................................................45第五章检查井施工及闭水实验........................................................51第六章施工进度计划和进度保证措施............................................546.1、关键项目的工期限制...................................................546.2、工期管理组织机构.......................................................546.3、工期保证措施...............................................................56第七章质量保证措施.......................................................................61第八章安全文明保证措施...............................................................70第九章季节性施工、已有设施、管线的加固、保护等施工措施799.1、季节性施工措施...........................................................799.2、已有设施、管线的加固、保护等施工措施...............80第一章总体概述1.1、工程概况一、工程项目名称、项目划分1、项目名称安徽省宿松县污水处理工程(管网部分)。2、项目划分本工程为安徽省宿松县城污水收集主干管,分为四个子项,即白洋河截污管、向阳河截污管、进厂总管和尾水排放管四个子项。其中向阳河截污管、进厂总管全线采用顶管法施工,白洋河截污管除穿越道路和现有建筑采用顶管法施工,其余均采用大开挖施工(位于农田内)。尾水排放管采用钢管焊接施工。二、结构形式1、开挖管工程管材采用HDPE双壁波纹管(管材甲供),承插式橡胶接口。2、顶管工程顶管管材采用DN800mm、DN1000mm、DN1200mm的F型混凝土管,每节长2M,橡胶圈封口。3、尾水排放采用DN1000mm钢管焊接,外防腐采用IPN8710-3涂料制作二布四重油工艺方法,内防腐使用IPN8710-2B涂料并采用二底二面工艺方法。3、...