4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间5WIH When, Where, Who, What, Why, How to6M Man, Machine, Material, Method, Measurement, Message7QCTools 7 Quality Control Tools 品管七大手法A.S.A.P As Soon As Possible 尽可能快的ACC Accept 允收AFR annual failure rateAOD Accept On Deviation 特采AOI automatic optical inspection AP application programAPP Approve 核准,认可,承认AQL Acceptable Quality Level 运作类允收品质水准ASS'Y Assembly 装配,组装ATE automatic test equipment AVL approved vendor list BGA Ball Grid Array BIOS basic input /output systemBOM bill of material BOM Bill Of Material 物料清单C=0 Critical=0 极严重不允许CAD Computer Aided DesignCAD/ID computer aided design /industrial designCAE Computer Aided EngineeringCAM Computer Aided ManufacturingCAR corrective action request CAR Correction Action Report 改善报告CGOO China General PCE龙华厂文件CHK Check 确认CLCA closed loop corrective action CND can not duplicateCP capability index 能力指数CPK capability process index 模具制程能力参数CPU Central Processing Unit 中央处理器CR Critical 极严重的CTN Carton 卡通箱D/C Date Code 生产日期码DC Document Center 资料中心DCC document center control DIA Diameter 直径DIM Dimension 尺寸DOA dead on arrivalDPPM defect parts per millionDQA Design Quality Assurance 设计品质保证DT Desk Top 卧式(机箱)DVD Digital Video DiskDVT design verification testDWG Drawing 图面ECN engineering change notice ECN Engineering Change Notice 工程变更通知(供应商)ECO engineering change orderECO Engineering Change Order 工程改动要求(客户)ECR engineering change request EDC electronic data centerEE electronic engineer(ing)E-MAIL Electrical-Mail 电子邮件EMC electromagnetic compatibilityEMI electromagnetic interferenceEN engineering noticeEOL end of lifeEOS Elwctrical Over Stress ES En...