巴基斯坦拉合尔橙线项目一部轨道工程拌 合 站 质 量 手 册巴基斯坦拉合尔橙线项目一部二 O 一六年九月目 录一.项目介绍······················································4二.混凝土场所布置规划·········································5三、管理制度······················································61,设备管理·······················································61.1《机械操作管理制度》······································61.2《设备的定期维护保养制度》·····························71.3 《2*120 型混凝土搅拌楼操作规程》···················91.4《混凝土泵车操作规程》···································101.5《混凝土搅拌车操作规程》································111.6《装载机操作规程》·········································121.8 附:主要机械设备一览表··································142,人员管理·······················································152.1《拌合站站长岗位职责》···································152.2《副站长岗位职责》·········································162.3《操作手岗位职责》·········································172.4《外籍员工岗位职责》······································182.5 附:人员配备台帐》·········································193,质量管理》·····················································203.1...