塔吊安装与拆卸工程专项施工方案编制指南工程名称:文件编号:CSCEC5-FAZN-12(项目自拟编号)发布日期:执行日期:插入项目效果图[工程概况]塔吊安装与拆卸工程专项施工方案目录一、编制说明·············································································11.1编制依据·······································································11.2编制人员·······································································11.3发放范围·······································································1二、工程概况·············································································22.1工程概况·······································································22.2周边环境概况·································································22.3塔吊概况·······································································22.4施工平面布置·································································22.5施工要求和技术保证条件··················································3三、施工计划·············································································53.1进度计划·······································································53.2材料与设备计划······························································5四、施工管理及作业人员配备和分工···············································74.1施工管理人员·································································74.2专职安全管理人员···························································74.3特种作业人员·································································74.4其他作业人员·································································7五、施工工艺技术·······································································85.1塔吊技术参数·································································85.2塔吊安装·······································································85.3附着与顶升··...