电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

桥梁桩基础施工技术探析

桥梁桩基础施工技术探析_第1页
1/3
桥梁桩基础施工技术探析_第2页
2/3
桥梁桩基础施工技术探析_第3页
3/3
桥梁桩基础施工技术探析桥梁桩基础施工技术探析 摘要:桥梁作为重要的交通道路,对运输行业具有重要的作用,桥梁工程的施工关系到桥梁的稳定性、安全性及使用寿命。因此本文结合桥梁工程的施工概况,并从桥梁施工的准备阶段、钻孔要点与清孔、钢筋笼的制作、起吊以及混凝土的灌注等方面分析桥梁桩基础的施工技术,有利于提高我国桥梁施工的技术水平。 关键词:桥梁;桩基础;施工技术;提高水平 Abstract: as an important bridge traffic road, the transportation industry plays an important role, the construction of bridge engineering is related to the stability of the bridge, safety and service life. So based on the construction of bridge engineering survey, and from bridge construction preparation stage, drilling points and hole cleaning and steel reinforcement cage production, lifting and concrete filling, this paper analyzes the bridge pile foundation construction technology, to improve the technical level of bridge construction in our country. Keywords: bridge; Pile foundation; Construction technology; Improve level 中图分类号:TU47 文献标识码:A 文章编号:2095-2104(2025) 1.前言 社会经济的进展使得我国的交通建设取得较大进展,桥梁作为重要的交通要道对经济进展起到重要的促进作用。因此探讨桥梁桩基础的施工技术问题,有利于控制好桥梁施工的各环节工作,确保桥梁的稳定性与安全性。 2.工程概况 某桥的刚架墩根据线路纵向布置,跨线的结构位于刚架墩之上横跨现浇的空心板梁,里程自 DK106+724.8 到 DK106+787.2 为四组错开钢架桥(2×8m+2×8m+2×8m+2×8m);桥两侧的纵向刚架墩中横向的中心间距是 26.6m。 2.1 施工准备 桥梁桩基础的施工前应平整好场地、清除场地的杂物,并且桩的埋深不足的地方应填土、打夯并密实;进行桩孔的定位,根据图纸的设计要求,准确钻孔中心的位置定位出来同时增设护桩,有利于在钻孔的过程中更好地核对桩位。做好埋设护筒工作,护筒使用4 毫米到 8 毫米的钢板卷制进行加工,护筒的内径应大于桩径 20 厘米到 40 厘米。对于已经确定了桩位的地方对开挖范围、护筒位置进行标注;开挖之前还应用十字交叉法把桩中心引到开挖范围外...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

桥梁桩基础施工技术探析

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部