混凝土工冬季施工方案吉林市中百利呈建设工程有限公司2025 年 2 月 2 日目 录1.工程概况················································22.编制依据···············································23.施工准备················································23.1 材料准备··············································23.2 机具准备··············································23.3 人员准备··············································23.4 现场准备··············································23.5 技术准备···············································34.施工方法················································34.1 混凝土的拌制··········································34.2 混凝土的运输···········································44.3 混凝土的浇筑·········································44.4 混凝土的养护·········································65.混凝土的测温···········································65.1 测点布置原则·········································65.2 测温方法·············································65.3 测温要求·············································65.4 大体积混凝土养护测温记录·····························65.5 混凝土拆模要求···················...