23#-25#栋及地下室一工程消防工程施工方案 2025 年 2 月 18 日目 录第一章、编制依据及编制说明 ·······························031.1 编制依据·······································031.2 编制说明 ·······································03第二章、工程概况及特点 ···································032.1.总述 ············································032.2.现场概况 ········································042.3.本项目工程的施工目标 ····························042.4.工程概况 ········································042.5.本工程的重点及难点 ······························19第三章、项目组织管理机构 ·································203.1. 机构框图、人员分工·····························203.2. 管理机构职责划分·······························21第四章、总平面布置 ·······································23 4.1. 施工现场平面布置及说明··························23第五章、施工进度计划及劳动力安排·························245.1. 施工段划分及施工计划安排·······················245.2. 总工期及进度计划安排···························255.3. 工 程 劳 动 力 、 机 械 设 备 计 划 表 和 施 工 程 序图·········25第六章、施工机械设备 ·····································256.1. 拟投入的主要施工机械设备·······················256.2. 主要施工机械设备进场计划·······················25第七章、施工技术措施 ···········...