目 录1 工程概况..........................................................12 施工总体布置和准备工作............................................12.1施工总体布置及思路...........................................12.2技术准备.....................................................22.3施工机具.....................................................22.4材料准备.....................................................23 主要施工工艺和技术保证措施........................................23.1施工工艺流程.................................................23.2主要施工工艺和技术保证措施...................................24 施工进度控制......................................................95 质量标准..........................................................95.1焊材的选用及管理.............................................95.2焊接 H 型钢的的工艺流程及检验标准.............................9焊接 H 型钢制作工艺流程图...........................................105.3钢梁安装允许偏差及检查方法:................................125.4质量保证措施................................................125.5质量记录....................................................125.6焊缝探伤....................................................126 安全文明施工.....................................................147 成品保护.........................................................141 工程概况河南省****建设工程位于郑州市****路**号,紧邻****机关,主楼屋顶约+96.800 米(钢梁顶面标高)处设计有 3400mm 悬挑结构造型,结构上采纳钢梁,除 3400mm 的悬挑外,钢梁向主体结构内延伸一跨,形成简支结构梁,外段悬挑。钢梁与主体混凝土结构的连接,采纳砼柱顶安装预埋铁件,钢梁与柱顶埋件焊接连接。钢梁外露,设计要求进行防腐和防火处理,防火涂料采纳薄涂型涂料,耐火极限设计要求达 1h。施工现场在 4~5/F~G 轴间布置有 TC5013 塔吊一台,塔吊臂长 32.500 米。插图 1 现场塔吊平面布置图2 施工总体布置和准备工作2.1 施工总体布置及思路本工程钢顶钢结构的制作与安装施工拟选择具有专业承包资质的钢结构厂家承担施工。钢构件的制作、加工在工厂内进行,由公...