目 录1、工程概况和特点...........................................................31。1 工程简述................................................................31.2 工程规模.................................................................32、编制依据.................................................................33、开工前准备计划...........................................................33.1 人员准备计划.............................................................43.2 工机具准备计划...........................................................84、施工管理目标.............................................................84.1 质量目标.................................................................84.2 工期目标.................................................................84.3 安全目标.................................................................85、光伏支架安装.............................................................85.1 施工准备.................................................................85.2 一般规定.................................................................95。3 支架零部件及支架基础的检查..............................................95。4 标准螺栓及组件的要求和质量检验.........................................105。5 光伏组件支架安装工艺要求...............................................105.6 质量标准................................................................106、光伏组件安装............................................................116.1 光伏组件安装前准备......................................................117、光伏组件安装安全通则....................................................138、安全文明施工............................................................14光伏支架及电池板安装施工方案1、工程概况和特点1。1 工程简述 由华能阜新风力发电有限责任公司投资建设的华能彰武风光互补(章古台)(20 兆瓦)光伏发电站项目地处辽宁省阜新市彰武县北部的彰古台镇的低丘沙地区域。场地周围地势开阔,但略有起伏,周围基本无大型障碍物,光伏电站站址区...