马峙修船基地船坞围堰拆除及进坞航道疏浚、炸礁工程(水下炸礁部分)施工组织设计编制单位:广西航务工程局舟山项目经理部编制人:审核人:编制日期:2005年6月30日目录第一章工程概况及施工条件分析···········································11.1工程概况··································································11.2气象、水文条件和工程地质··········································21.3施工条件分析····························································2第二章施工布置································································42.1工程总目标·······························································42.2施工管理组织机构及职责·············································42.3施工人员、机械、材料组织··········································72.4施工准备工作····························································8第三章施工方法································································93.1施工顺序··································································93.2施工机械选择···························································103.3水下清挖覆盖层施工方法············································113.4进坞航道水下炸礁施工方法········································13第四章施工进度控制························································274.1施工安排································································274.2施工工效分析··························································294.3施工进度计划··························································314.4工期保证措施··························································33第五章····················施工质量控制···365.1质量保证体系··························································365.2质量控制标准··························································405.3质量保证措施··························································40第六章·············施工安全控制和爆破安全评估···436.1安全保证体系···························································436.2安全保证措施··········...