挡土墙工程施工组织设计编制日期:二0一0年二月目录一、编制说明········································二、编制依据及原则··································2.1编制依据·····································2.2编制原则·····································三、工程管理目标·····································四、工程概况·········································4.1工程地理位置·································4.2施工场地周围环境·····························4.3工程范围及规模·······························4.4工程主要特点·································五、设备、人员动员周期及材料组织供应··················5.1人员、设备动员周期····························5.2技术准备······································5.3材料组织供应··································六、施工准备及临时设施·······························6.1临时房屋设施··································6.2水、电设施····································七、施工组织机构的建立·······························7.1组织机