第六部分施工组织设计第1页共195页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共195页目录1.前言·······································22.工程概况················································································································53.施工部署·····································64.施工准备及平面布置································125.主要项目的施工方法································································································206.季节性施工措施····································································································2917.质量检验计划·······································································································2938.质量保证措施··································2989.创优措施·············································································································30510.施工进度保证措施································31011.安全施工措施及安全检查制度···························31212.承诺达到市区级标准化工地的施工措施·······················33913.环境保护措施··································34414.与专业安装工程的衔接及配合···························34515.质量通病预防措施································34716.新技术、新材料的应用······························35917.降低工程造价措施································································································36018.工程质量回访、保修及违约经济处罚的承诺·······························································362附表一:固原市泰合嘉园A区项目施工进度控制计划附表二:固原市泰合嘉园A区项目施工施工平面图附表三:拟投入本标段的主要施工设备表附表四:拟配备本标段的试验和检测仪器设备表附表五:劳动力计划表附表六:临时用地表第2页共195页第1页共195页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共195页1.前言1.1编制说明本施工组织设计是遵照我泰合建设集团有限公司质量文件、管理制度、技术管理程序,按照《固原市泰合嘉园A区项目施工》的设计施工图及招标文件中确定的原则编制,我公司在施工组织设计中对整个工程的施工组织、施工部署、施工方法进行了重点介绍,编制了相应的施工方案及专项施工技术措施。以确保优质、高速、安全、环保、低耗地建设本工程,为业主贡献优质、满意的建筑产品。1.2编制范围及依据1.2.1固原市泰合嘉园A区项目施工的施工招标文件;1.2.2由业主提供的本工程结构、建筑、安装施工图...