初步施工组织设计编制单位:第2页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第2页共38页目录1施工组织设计依据·····················52工程概况·························52.1总概述························52.2机电工程概况·····················52.3机电工程的特点····················63施工组织措施······················63.1设备、人员动员周期··················63.2设备、人员、材料运到施工现场的方法··········63.3项目经理部管理职责··················73.4项目经理部管理系统··················74进度计划管理·······················94.1概述·························94.2机电工程进度计划···················94.3施工进度月计划的编制·················9第3页共38页第2页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第3页共38页4.4施工进度计划的控制··················95施工技术管理······················105.1施工图的自审和会审··················105.2做好技术交底·····················126质量保证措施·······················136.1机电工程质量目标···················136.2质量保证体系·····················136.3施工过程质量控制···················146.4施工过程中的五大因素控制···············166.5施工过程质量的自控自评················176.6关键部位的过程质量控制················186.7施工质量检验方法···················196.8不合格品控制·····················207创优夺杯的措施······················217.1组织落实·······················217.2制度落实·······················217.3措施落实·······················21第4页共38页第3页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第4页共38页8劳动力和施工机具的组织··················228.1劳动力的组织·····················228.2施工机具的组织····················229安全生产的管理·····················229.1保证安全生产措施···················229.2安全生产管理机构设置·················239.3安全生产的措施····················2410文明施工措施联系····················2510.1文明施工目标·····················2510.2文明施工管理措施···················2511成品保护························2611.1施工顺序·······················2711.2成品保护的措施····················2712.安装工程施工方案····················2713工程资料管理······················2713.1概述·························2713.2工程资料体系····················27第5页共38页第4页共38页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第5页共38页13.3工程资料的主要内容···············...