第0页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第0页共40页10kV配电线路施工组织措施及施工方案第一章工程概况及特点···········································2第二章施工现场组织机构···········································4第三章施工现场总平面布置·········································8第四章施工方案·····················································9第五章施工综合进度及保证工期措施································14第六章质量目标质量保证体系技术组织措施·························17第七章安全目标、安全保证体系及技术措施·························23第八章环境保护和文明施工··········································28第九章计划统计肯信息管第1页共40页第0页共40页编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页共40页理··········································30第一章:工程概况及特点1
1、工程概况本工程为丹达河35KV变电站-大坝以及35KV变电站-厂房10KV输电线路新建工程,线路起于丹达河35kv变电站出线构架悬挂点起,至大坝以及厂房终端杆止,总长度约14500
63m(其中35KV变电站-大坝1544
32m,35KV变电站-厂房12956
31m),线路采用LGJ-70/7导线
本段线路地形为高山大岭
第2页共40页第1页共40页编号:时间:202