绩溪支行综合布线、机房智能化系统工程施工组织设计安徽海越建设工程公司-1-施工组织设计及工程进度计划目录一、施工组织设计编制说明工程概况及人员组成···············31.编制说明····························31.1说明······························31.2本施工组织设计编制依据·····················31.3编制目的···························41.4适用范围···························41.5质量目标与工期目标······················52、工程概况····························53、人员组织····························73.1施工管理及人员组织机构·····················73.1.1施工组织机构人员架构图····················83.1.2主要施工管理人员表······················83.1.3项目负责人的简历及业绩····················93.1.4技术负责人的简历和业绩:··················103.2现场施工人员安排计划·····················103.3现场投入施工人员计划表···················11二、仪器及施工机械设备的准备情况···················112.1施工机械设备及仪器的配备情况说明··············112.2投入本工程的主要仪器和施工机械设备表·············11三、工程总体进度计划·························123.1施工准备··························123.2施工进度保障的技术措施···················133.3材料供应计划························143.4与建设方的配合协调和物质准备工作··············143.5工期保证措施························153.5.1制订完善的施工进度计划···················153.5.2材料组织·························163.5.3交叉施工·························163.5.4劳动力配臵及灵活安排···················163.5.5充分利用本公司技术和人员优势···············163.5.6、施工工期·························163.5.7、工程总体进度计划表见附录·················16四、主要施工项目的施工方法······················174.1、施工顺序及工艺安排·····················174.2、施工方法··························174.3、定位放线技术及要求·····················184.4、砌砖墙体工艺技术及要求···················18绩溪支行综合布线、机房智能化系统工程施工组织设计安徽海越建设工程公司-2-4.5、防水技术及要求·······················184.6、龙骨条形铝扣板天花技术及要求················194.7、地板工程··························204.8、板墙面工程·························204.9、面饰ICI乳胶漆工艺技术及要求················214.10、木门施工技术要求·····················224.11、玻璃门安装施工方案····················234.12、玻璃安装工艺技术及要求··················244.13、主机房天花区域防渗漏水处理办法··············254.14、照明器具安装·······················254.15、电路...