1废水池环氧胶泥防腐施工施工方案2008年二月2目录1.0编制原则及依据··········································································32.0施工准备·····················································································33.0施工方法·····················································································44.0质量保证·····················································································65.0产品防护措施·············································································86.0施工进度保证措施······································································831.0编制原则及依据1.1编制原则及依据1.1.1为业主编制科学合理的工程建设计划提供依据;1.1.2作好施工前的准备工作,为保证资源供应提供依据;1.1.3为确定低成本、高质量、快工期的施工可行性和经济合理性提供依据;1.1.4以工程的高质量、快工期、文明、安全、环保、经济、实用为中心思想编制本施工组织设计;1.1.5从公司的工程师和专家及在类似工程施工的老技术人员经验中学习,并参考了一部分实用的施工技术规范。1.1.6《涂装前表面处理规范》(SYJ4007-86)1.1.7以往施工经验2.0施工准备2.1建立项目组织按如下构架建立现场项目组织,明确项目部各人员的职责,保证现场施工的安全、高速、有效运行。2.2教育与培训由项目部组织,公司工程部负责,利用国家法规、各相关单位的安全规定和制度以及本施工方案和公司的安全操作规程,对所有参与施工的人员进行教育与培训;必要或业主有要求时,尚需请专业人员对我公司员工进行特4别培训。2.2.1安全制度与措施(1)安全施工操作规程2.2.2工艺操作规程(1)防腐蚀施工工艺操作规程2.2.3质量标准与控制措施(1)国家或行业有关防腐的质量检验评定标准(2)设计资料规定的质量标准2.2.4施工现场文明施工管理(1)业主的施工现场管理规定(2)本公司的现场管理规定2.3临时设施建设所有的施工临时设施将建在业主指定的区域和地点。施工现场的办公临设主要采用我公司的移动式办公集装箱。在业主的指定下,将施工现场的施工用临时水、临时电等接引至现场。2.4材料与机械准备工程施工采用包工包料形式。现场施工所需的设备与材料都由施工单位负责。施工机械必须性能优良,安全可靠;施工用料必须质量合格,型号规格和技术指标都符合规范要求和合同规定。2.5施工现场的临时设施和机械布置实行定置管理,并根据现场施工进度情况进行调整和及时清理。3.0施工方法本施工方法适用于废水池槽池施工。环氧胶泥具有优良的耐酸、碱,耐水性能。3.1机械除锈废水池水泥池槽的除锈采用砂轮机机械动力除锈方式,要求除锈等级达到St3级。除锈后把池表面灰尘、污物清扫干净。53.2环氧胶泥的配比:3.2.1E44(6101)环氧树脂材料技术性能指标:项目指标项目指标外观淡黄色至棕黄色粘厚透明液体有机氯,mol/100kg≤0.01分子量350~450无机氯,mol/100kg≤0.02环氧值mol/100kg0.41~0.47挥发分,%≤1软化点,℃10~203.2.2T31固化剂的主要技术指标:项目指标外观透明,棕色粘稠液体胺值(KOH),mg/g460~480粘度(25℃),Pa·s1.10~1.30LD50,mg/kg7852~1122加入量(常温),%15~203.2.3稀释剂二甲苯型(2608树脂)树脂材料技术性能指标:项目指标项目指标外观淡棕色、无异状液体酸值(KOH),mg/g25.5±4.5粘度(25℃),Pa·s0.35±0.12固含量,%64.0±3.5凝胶时间(25℃),min45.0±15.8热稳定...