目录1施工条件、导流、交通运输与施工布置···············31.1工程简述··························31.2施工条件··························41.3施工导流··························41.4交通运输··························41.5主体工程项目及其工作内容··················41.6主要控制性目标·······················41.7施工总平面布置·······················52施工方案与技术措施·······················92.1工程特点及施工重点和难点··················92.2总体施工方案························102.3施工准备··························102.4施工测量··························122.5施工导流及排水·······················162.6土方开挖施工························172.7土方填筑施工························212.8混凝土工程施工·······················282.9拆除工程施工························352.10砌石工程施工························362.11路面工程施工························382.12房屋工程施工························422.13金属结构设备安装施工····················462.14机电设备安装施工······················493质量体系与措施·························563.1质量方针··························563.2质量目标··························563.3施工质量管理组织机构····················563.4工程质量保证机构······················573.5工程质量保证措施······················593.6主要项目质量控制措施····················603.7冬季、雨季施工措施·····················683.8工程原材料、中间产品、金属结构检测计划···········704安全生产及文明管理体系与措施··················724.1安全保证体系及保证措施···················724.2文明施工措施························794.3环境保护管理体系与措施···················825工程进度计划与措施·······················855.1施工总进度计划编制说明···················855.2施工总进度网络图及说明···················855.3施工工期保证措施······················856资源配备计划··························896.1主要施工机械设备配置计划··················896.2资金使用计划························906.3劳动力配备计划·······················906.4主要材料计划························906.5现场施工人员劳动技能保证措施················911施工条件、导流、交通运输与施工布置1.1工程简述1.1.1工程概况黄梅县位于湖北省黄冈市东南部,地处长江中游北岸,东部与安徽省接壤,南面是长江,与江西省九江市隔江斜对,西面是武穴市。黄梅县辖12个镇4个乡,国土面积1701km2。黄莲咀泵站排区位于黄梅县南部地区,属华阳河水系。华阳河水系为长江一级支流,在湖北境内主要分布于黄梅武穴两县市,于华阳...