10KV线路架设及电缆敷设安装工程预算书表三丙金额单位: 元其中:其中:其中:其中:人工材料机械工资一工地运输0.12-753 人力运输 平均运距200m 内10t.km 0.32617.342617.34 0.000.0000785 785工地运输12-755 汽车运输 汽车装卸10t1.4487.76142.7131.69 313.3600683 2002-756 汽车运输 汽车运输10t.km 1.317.807.66 0.0010.14002310二土石方工程2-758 土石方10m31.2178.47165.18 13.290.00 002141982-521 电缆沟挖填土方土m3113.2813.280.000.000013132-691 电缆角钢接地极根/ 1套4320.021.9013.531.806.57320088542-698 电缆接地母线敷设10m0.5114.84 108.76 2.793.29005754三杆塔工程2-764 拉线盘安装 LP6块1270.06.896.890.000.00840083832-805 拉线制作安装 普通拉线GJ-50mm2根12360.015.6214.041.580.0043200187 1682-771 电杆组立 10m砼杆根 11050.050.7233.952.314.47642051342-772电杆组立 12m非予应力砼杆根621600.072.5148.512.3021.79920004496 30082-773电杆组立 15m非予应力砼杆根 44000.091.4067.402.3021.7160000366 270砼杆标示牌块6646.03036000BX6砼杆防腐环氧煤沥青漆玻璃布一布二油m26615.193.6611.530.000010032412-788 10kV直线杆单铁横担安装组56583.710.358.421.930.003268805804722-789 10kV直线加强杆ZJ双铁横担安装组 11152.015.8313.282.550.001152016132-789 10kV耐张杆N双铁横担安装组 32542.815.8313.282.550.007628016132-789 10kV耐张转角杆NJ2双铁横担安装组 33010.215.8313.282.550.009031047402-789 10kV终端杆双铁横担安装组 31430.015.8313.282.550.00429004740四架线工程2-613 铝芯电缆敷设YJLV22-10kV/3*95 (400内)100m1.1 14300.0 1779.31118.66501.66194.84 422.1614300177911195022-819 绝缘架空导线架设 JKLYJ-1kV/70mm2km .单线3.37524.0437.88246.11 153.0838.6924829014458122-816 导线架设 LGJ-70mm2km /单线86501.031.2 644.88371.72226.5246.645200831515929742-833 杆上 复合跌落保险安装 HRW11-10/200A组 1629.0968.460.6731.4029.270.0062996861312-645 高压户内电缆终端头制安个 1520.0127.3343.4083.930.005200127432-649 高压户外电缆终端头制安个 1585.0166.22 97.2768.950.005850166972-822 导线跨越电力、公路、通讯线路处9360.86225.17 106.71 28.98003248 20272-974 电缆试验 泄漏试验根次192.7533.700.6158...