年产 10 万吨石英砂生产线项目可研报告项目可行性研究报告资金申请报告项目建议书可行性研究报告1、项目名称-----指项目立项批复时的名称,应不超过 30 个字(两个英文字段作一个汉字)。2、建设地点-----指项目所在地详细地址,公路、铁路应填写起止地点。3、行业类别-----按国标填写。4、总投资-----指项目投资总额。5、主要环境保护目标-----指项目周围一定范围内集中居民住宅区、学校、医院、保护文物、风景名胜区、水源地和生态敏感点等,应尽可能 给出保护目标、性质、规模和距厂界距离等。6、结论与建议------给出本项目清洁生产、达标排放和总量控制的分析结论,确定污染防治措施的有效性,说明本项目对环境造成的影响,给出建设项目环境可行性的明确结论。同时提出减少环境影响的其他建议。7、预审意见-----由行业主管部门填写答复意见,无主管部门项目,可不填。8、审批意见-----由负责审批该项目的环境保护行政主管部门批复。fancy style popular in those days. It was also a treasure decorated with gold and jewels, which took the country’s best artists about ten years to make. In fact, the room was not made to be a gift. It was designed for the palace of Fredrick I. However, the next King of Prussia, Fredrick William I, to whom the amber room belonged, decided not to keep it. In 1716 he gave it to Peter the Great. In return, the Czar sent him a troop of his best soldiers. So the Amber Room became part of the Czar’s winter palace in St Petersburg. About four metres long, the room served as a small reception hall for important vistors. Later, Catherine Ⅱ had the Amber Room moved to a palace outside St Petersburg where she spent her summers. She told her artists to add more details to it. In 1770 the room was completed the way she wanted. Almost six hundred candles lit the room, and its mirrors and pictures shone like gold. Sadly, although the Amber Room was cnsidered one of the wonders of the world, it is now missing. In September...