下载后可任意编辑中英文对比施工方案目 录Contents1
工程概况 General2
编制依据 References3
施工顺序 Construction Sequence4
施工方法 Construction Method5
安全与环境保护施工措施 HSE6
劳动力计划 Manpower Mob
Schedule7
机具计划 Equipment/Tools Mob
Schedule8
施工作业计划 Construction Schedule1
工程概况 General该项目为珠海 PTA 二期工程,本方案主要是为 PTA 二期变电所结构而编制的施工技术措施
主体结构三层钢筋砼框架,局部为二层钢筋砼框架结构,变压器区域采纳钢筋砼墙体
This method statement is compiled to describe the substation structure construction method of Zhuhai PTA No
2 Project, which major structure is three-layer reinforced concrete frame and partial structure is two-layer reinforced concrete frame and transformer area is reinforced concrete wall
编制依据 References2
施工图纸 Construction Drawings REV
2 6092-BCO
01-DW-1741-01 to 25 2
2 工程测量法律规范 Code for Engineering Surveying GB50026-93 2
3 混凝土结构工程施工质量验收法律规范 Code for Qual