目 录 Content 一.调试说明及依据标准…………………………………………………………………………………………2 1). Commissioning Description and Reference Standard 二.调试概况……………………………………………………………………………………………………………………3 2). Brief Introduction of Commissioning 三.施工准备……………………………………………………………………………………………………………………4 3). Preparation before Construction 四.调试操作工艺…………………………………………………………………………………………………………6 4). Technique of Commissioning Operation 五.调试质量标准…………………………………………………………………………………………………………9 5). Quality Standard for Commissioning 六.成品保护…………………………………………………………………………………………………………………12 6). Protection of Finished Product 七、应注意的质量问题……………………………………………………………………………………………12 7). Quality Problems to Be Aware 八、质量记录…………………………………………………………………………………………………………………13 8). Quality Record 九、安全标准…………………………………………………………………………………………………………………13 9). Safety Standards 附录………………………………………………………………………………………………………………………………………14 Appendix 2 一、调试说明及依据标准 1). Commissioning Description and Reference Standard 1、调试说明 1. Commissioning Description 1.1、本调试方案仅适用于改造工程空调调试工作。 1.1. This commissioning proposal is only applicable to GSKNP Flu. Facility Revamping Project for commissioning of HVAC system. 1.2、本调试方案根据本项目的通风空调系统结构、施工进度和现场条件而制定。 1.2. This commissioning proposal is designed base on these, HVAC systematic structure, constructional schedule and site conditions. 1.3、本调试方案依据文件:合同文件、施工图纸、业主现场要求、...