AGREEMENT OF BOT PROJECTThis Agreement is made and entered into by and betweenThe government of_____________(hereinafter called "B") representedby________(hereinafter called "A")And__________Corporation, a company duly organized and existing under thelaws of the People's Republic of China with its principal officeat___________(hereinafter called "C").Whereas, A and C concluded the Memorandum Concerning __________Projecton the ____________and C had been given Exclusive Right from B to carryout investigation and implement ____________Project (hereinafter called"the Project") by way of joint financing between C and B (so called BOT).Whereas, the loan agreement, guarantee agreement, letter of guarantee,etc. shall constitute integral components of this Agreement. TheProject'sinstalled capacity is __________.Now therefore, the parties hereby agree as follows:1. Definition and Interpretation"Project" means the planning, feasibility study, design andengineering, construction, equipping, completion, testing,commissioningand operation of the infrastructure project."Project Cost" means the cost specified in Clause 3."Operation Period" means the period specified in Clause 10.1 from thestarting date of commercial operation of the infrastructure project."Completion Date" means the day upon which C certifies that theinfrastructure project has successfully completed its testing and canstart Operation Period."Force Majeure" shall have the meaning specified in Clause 16."Project Scope" means the scope of supply and services of C inconnection with the execution of the Project as described in Annex 2."Site" means the site for the infrastructure project including___________, special roads, and other areas for construction as specifiedin Annex 2."Transfer Date" means...