电脑桌面
添加小米粒文库到电脑桌面
安装后可以在桌面快捷访问

CQI11审核表

CQI11审核表_第1页
1/10
CQI11审核表_第2页
2/10
CQI11审核表_第3页
3/10
CQI-11Special Process: Plating Sy stem AssessmentVersion 1 Issued 8/07QuestionNumber问题编号Question/问题Requirements and Guidance/要求与指南Objective Evidence/客观证据N/A Satisfactory/满意NotSatisfactory/不满意Needs ImmediateAction/需立即采取措施1.1Is there a dedicated andqualified plating person on-site?/现场是否配备有资格的电镀员工?To ensure readily available expertise, there shall be adedicated and qualified plating person on the site.This individual shall be a full-time employee and theposition shall be reflected in the organization chart. Ajob description shall exist identifying thequalifications for the postition including chemical andplating knowledge. The qualifications shall include aminimum of 5 years experience in plating andsurface finishing or a combination of formalchemistry/chemical engineering education andplating experience totaling a minimum of 5 years.为充分保证可使用的专业技术,现场应配备专职并有资质的电镀人员。此人员必须是位全职,并且职位应在组织图中体现。工作描述必须确定此职位涉及的化学和电镀知识的资质。资质必须包括至少5年在电镀和表面处理方面的从业经验,或正规化学/化学工程专业教育并且在电镀领域至少从业5年的工作经历。1.2Does the plater performadvanced quality planning?是否进行电镀的先期质量策划?The organization shall incorporate a documentedadvance quality planning procedure. A feasibilitystudy shall be performed and internally approved foreach part. Similar parts can be grouped into partfamilies for this effort as defined by the organization.After the part approval process is approved by thecustomer, no process changes are allowed unlessapproved by the customer. The plater shall contactthe customer when clarification of process changesis required. This clarification of process changesshall be documented.组织必须结合文件化的先期质量策划的程序。针对每个零件必须进行可行性分析并获...

1、当您付费下载文档后,您只拥有了使用权限,并不意味着购买了版权,文档只能用于自身使用,不得用于其他商业用途(如 [转卖]进行直接盈利或[编辑后售卖]进行间接盈利)。
2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。
3、如文档内容存在违规,或者侵犯商业秘密、侵犯著作权等,请点击“违规举报”。

碎片内容

确认删除?
VIP
微信客服
  • 扫码咨询
会员Q群
  • 会员专属群点击这里加入QQ群
客服邮箱
回到顶部