CSPC NANHAI PETROCHEMICALS PROJECT CSPC 南 海 石 化 项 目 FABRICATION AND ERECTION OF TANK W ORK INSTRUCTION 储罐制作及安装作业指导书 WORKING INSTRUCTION:WI-8710-8100-2006 SEPCO Electrical Pow er Construction Corporation 山东电力基本建设总公司 REV DATE REASON FOR ISSUE BY CHK’D REVIEW APPR A 22 JUL 2003 Issue for Review and approval WF LHJ CHY DPS 00 24 AUG 2003 Issue for implementation WF LHJ CHY DPS 01 12 SEP 2003 Issue for implementation WF LHJ CHY DPS 02 2 NOV 2003 Issue for implementation WF GHM ZX SDP Revision Information 修改记录 Rev 版次 Section No. 章节号 BSF review record No. BSF 审查单序号 Description of main changes 主要修改内容 02 5 Sections g 2 Add “DEP 30.46.00.31-CSPC THERMAL INSULATION (AMENDMENT/SUPPLEMENTS TO THE CINI MANUAL “INSULATION FOR INDUSTRIES”)” 增加“DEP 30.46.00.31-SCPC 保温(CINI 手册“工业保温”校正/增补版)“ Attachment B 3 Add” SEPCO2 QUALITY SYSTEM ORGANIZATION CHART FOR FABRICATION AND ERECTION OF TANK” 增加了“SEPCO2 储罐制作与安装的质量管理组织结构” 3.1 4 Sepco’s working scope don’t conflict with sepco2’s; Because we adopt three grade checking before acceptance Sepco’s 工作范围与 Sepco2’s 不冲突,因为我们采用的是三级验收。 5 5 Add safety , welding & survey procedures, issued by SEPCO 增加了 SEPCO 安全、焊接和焊接程序 Attachment C 6 Add” LAYOUT JOBSITE OF STORAGE TANK ” 增加了“储罐施工现场布置图” 9.3.7 7 Add” cleaning oil , grease and contaminant on the plate surface with fresh water before blasting.” 增加了“在抛丸前用清水清洁钢板表面的油,油脂及污染物。” 9.3.8 8 Add” Surface cleanness and surface profile should be relatively inspected with photo in the GB8923” rustiness and antirust grade of steel plate surface before blasting” 增加了“表面清洁度和轮廓根据 GB8923《涂装...