人工费材料费机械费人工材料机械基价合计人工费材料费机械费一110kv配电装置安装(一)D02-041YD2-23六氟化硫断路器安装LW35-126/3150 40KA,110kv,户外台2.00876.49 514.78 755.59 1114350.271809.53 1029.561511.182YD2-48高压隔离开关安装GW4A-126(IIDW)1250A 40KA, 110kv,户外组2.00294.07455.06119.98 1111757.19 607.11910.12239.963YD2-47高压隔离开关安装GW4A-126(DW)1250A 40KA, 110kv,户外组2.00271.96431.45119.98 1111664.33561.47862.90239.964YD2-108电流互感器安装LB6-110W2 110kv只6.0077.41123.2179.021111692.82479.44739.26474.125YD4-21端子箱安装面2.0028.5865.055.80111200.7059.00130.1011.606YD3-35软母线安装300mm2跨2.00147.9313.5293.04111518.52305.4027.04186.087YD3-2耐张绝缘子串安装110kv串12.006.081.673.89111142.0375.3120.0446.688YD3-2悬垂绝缘子串安装110kv串6.006.081.673.8911171.0237.6610.0223.349YD3-46引下线安装300mm2组4.0045.0443.88 107.03111789.61 185.97 175.52428.1210YD3-46设备连引线安装300mm2组6.0045.0443.88 107.031111184.42278.96 263.28642.18(二)D02-050.000.000.000.001YD2-23六氟化硫断路器安装LW35-126/3150 40KA,110kv,户外台2.00876.49 514.78 755.59 1114350.271809.53 1029.561511.182YD2-48高压隔离开关安装GW4A-126(IIDW)1250A 40KA, 110kv,户外组2.00294.07455.06119.98 1111757.19 607.11910.12239.96单位数量xx110kv变电所电气安装预算表基价定额调整系数 %合计序号定额编号单项工程名称人工费材料费机械费人工材料机械基价合计人工费材料费机械费单位数量基价定额调整系数 %合计序号定额编号单项工程名称3YD2-47高压隔离开关安装GW4A-126(DW)1250A 40KA, 110kv,户外组2.00271.96431.45119.981111664.33561.47862.90239.964YD2-108电流互感器安装LB6-110W2 110kv只6.0077.41123.2179.021111692.82479.44739.26474.125YD4-21端子箱安装面2.0028.5865.055.80111200.7059.00130.1011.606YD2-97电容式电压互感器安装TYD-110/√3-0.01H,户外,110kv只2.00108.69144.3560.13111633.35224.39288.70120.267YD3-2悬垂绝缘子串安装110kv串6.006.081.673.8911171.0237.6610.0223.348YD3-46引下线安装300mm2组4.0045.0443.88107.03111789.61185.97175.52428.129YD3-46设备连引线安装300mm2组6.0045.0443.88107.031111184.42278.96263.28642...