防静电环氧地坪施工Anti-staticEpoxySelf-levelingsystem抗静电环氧自流平地面MCC 上繭至治集团苞膿艺司SHANGHAIBAOVEGROUPCORP..LTD.龙游塔恩年产 3000T 烟用接装纸生产线技改项目23MCC 上濡至治集团苞膿艺司SHANGHAIPASTEGROUPCORP..LTD.龙游塔恩年产 3000T 烟用接装纸生产线技改项目StructureProfile 系统结构图:防静电面层 Anti-staticTop-coat导电层 ConductiveLayer找平层 Levelayer底漆 Primer 混凝土 ConcreteSystemDescription 系统介绍:MaterialDescription 材料说明:龙游塔恩年产 3000T 烟用接装纸生产线技改项目45Removeallremainingdustanddebrisbydrybrushingandvacuumcleaning 扫除残留的钢MCC 上漏至治集团苞膿艺司BAOVEGROUPCORP..LTD.龙游塔恩年产 3000T 烟用接装纸生产线技改项目6丸及灰尘,并真空吸尘;Repairallfloordefectssuchashoneycombs,scratches,workingjointsandsoonbyusingSikaDur®andSikaflex®rangeofmaterials..使用 SikaDur®与 Sikaflex®等系列产品对地面缺陷如蜂窝麻面、划痕、施工缝等进行修补;Mixingofmaterial 材料混合:Ingeneral,allproductsmustbemechanicallymixedusinganelectricalpowerstirrerwith300〜400rpm,priortomixingstirpartAmechanically.WhenallofpartBhasbeenaddedtopartA,continuouslymixfor2minutesuntilauniformmixhasbeenachieved.DependingontheproductadinthefillerorCcomponentandmixforanother2minutesuntilauniformmixhasbeenachieved.通常,在机械搅拌 A 组分之前,所有产品必须用电动搅拌器以 300〜400 转速/分机械搅拌。把所有 B 组分加入 A 组分之后,持续混合 2 分钟直到混合均匀。根据产品加入填料或 C 组分,继续搅拌两分钟直到混合均匀。Toensurethoroughmixing,pourmaterialsintoanothercontainerandmixagaintoachieveaconsistentmix.Overmixingmustbeavoidedtominimizeairentrapment.保证通过混合、倾倒材料进入另一容器后,再次搅拌达到一致混合。需要避免过度搅拌产生气泡ApplicationofPrimerandLevelinglayer 底油与找平层施工:ApplicationofSikafloor®161,consumptionapprox.0.4kg/m2forprimer;consumptionapprox.0.9kg/m?Sikafloor161mixedwith0.45kg/m2quartzsand.Sikafloor®161 用量大约 0.4kg/m?;底油固化后,施工环氧砂浆层,2.7kg/m27ApplicationofConductiveCopperTape 导电铜带施工CheckingandMeasuringofResistance 导电层电阻检测staticonO◎player 防静电面层施工MCC 上繭至治集团苜膿艺司SHA 船 HAFBA 釧 EGROUPCORR.LTD.龙游塔恩年产 3000T 烟用接装纸生产线技改项目8Temperature 温度Foottraffic 可步行Lighttraffic 轻度荷载Fullcure 完全固化+10 弋〜30hours〜5days〜10days+20 弋〜24hours〜3days〜7days+30°C〜16hours〜2days〜5days